213 Visiteurs connectés

CV de Shutdown Coordinator / MANAGER,, cherche un emploi de ENGINEER, SITE MANAGER, CONSTRUCTION MANAGER, SUPERINTENDENT , / coree-du-sud.enligne-int.com

coree-du-sud.enligne-int.com : cv

CONSTRUCTION MANAGER , SHUTDOWN MANAGER, SUPERINTENDENT

Code CV : 9604be279927c6a3
Date de dernière connexion : 2015-10-23

Monsieur GU... D...
....
650-020 TONGYOUNG city
Corée Du Sud




Situation actuelle:
Secteur d'activité actuel : Oil and Gas
Taille de l'entreprise : + de 1000 salariés
Fonction actuelle : Shutdown Coordinator
Nombre d'années à ce poste : 1 à 2 ans
Nombre de personnes sous mes ordres : 101 à 1000 personnes
Salaire annuel : 0.00 EUR
Expérience Totale : + de 15 ans
Disponibilité : Disponibilité immédiate
Poste recherché:
Fonctions: MANAGER,, CONSTRUCTION MANAGER, MANAGER mechanic and piping
Secteur d'activité: OIL and GAS, POWER PLANT, Energie, ENERGIE

Type de contrat souhaité: CDI, CDD, CDD Intermittent, Interim, Agent
Temps de travail souhaité: Temps plein, Temps partiel, En alternance, Journalier, Saisonnier, Travail le WE
Salaire Annuel Minimum / Souhaité: 0.00 / 0.00 EUR
Etudes :
Dernier niveau d'etudes validé avec diplome : Bac+2
Dernier diplome : DUT GENIE MECANIQUE et PRODUCTIQUE
Niveau d'études actuel : Bac+2
Autres Formations :


Mobilité :
nc
Outils / Logiciels / Méthodes maitrisés
Microsoft- Excel, Word, PowerPoint,

Permis VL, PL, véhicules spéciaux
FRANCAIS ET INTERNATIONAL

Langues
Anglais : Langue de travail
Espagnol : Langue de travail
Italien : Langue maternelle
Français : Langue maternelle



CV :

Monsieur GU... D
650-020 TONGYOUNG city
Corée Du Sud


Technical Skills: Functional Competencies: Business sectors:
Pipeline, Recognition of ground, Station of gas
Inspection, Followed and respect for the schedule, Unit of gas
Civil work, Audit, Pipeline gas
Excavation, Earthwork, Oil gas onshore and offshore
Steel structure, Construction Management Site, LNG ship
General installation, Follow-up of multidisciplinary construction site, Petrochemical
Rotating machines, Control cost, Hydro Power Plant
Mechanical, Engineering, Automated Line
Welding Procedure and control, Metal industry
Penetration test, Followed and modification of the design, Steel industry
Cathodic, Protection Start Up, Nuclear
Procedure and documentation, Consultation and negotiation of sub-contractors, Platform and suppliers


Computer Tools: Qualifications: Languages:

Microsoft- Excel, 1982: BAC F1 (Mechanical) French, fluent-written & spokenWord, 1984: DUT Mechanical Engineer English, fluent-written & spokenPower Point, 2009: OPPBTP GRTGAZ, Spanish, fluent-written & spokenElips, 2009: Risk training, H.P (GRTGAZ) Italian, fluent-written & spoken, 2010 Sas Huet offshore Portuguese spoken, German spoken2011: Risk Chemical, Risk ATEX, HSE port area, HSE auxiliary, HSE refinery, Respiratory Protection, Legionella, confined spaces.
Career Summary

Year: Customers: Positions:

2015 TOTAL Project Shutdown Coordinator/ Head of Construction Coordinator
2014 TOTAL Project Shutdown Coordinator
2013 TOTAL Shutdown Coordinator2012 AREVA Deputy Site Director2011 VALE Shutdown and General Maintenance Lead (mining)2010 TOTAL Shutdown Manager2010 SUNGDONG LNG Ship Construction Manager2009 SPAC GRTGAZ Station Interconnection Gas Superintendent2008-2009 ALSTOM POWER HYDRO Power plant Manager BOP Mechanical2006-2008 SIEMENS VAI Rolling mills Site Manager2002-2006 CRYOSTAR Cryogenic Compressor, Manager Heater Vaporaiser and Piping LNG ship2001 MERITOR Automated Line production Site Manager2000 EURALTEC Automated line production Manager Supervisor and special machine1989-1999 SNIG Oil Gas, Petrochemical, Gas, Nuclear Site Superintendent1986-1989 LEHOTA Nuclear, Gas Central Manager

Details of Professionals Experiences

2015 NIGERIA Function: Head of
Construction Coordinator / Project Shutdown Coordinator
Context: Followed prefabrication, piping, structure and E&I
for the Project OFON2
Phase 2A and Prepares and Coordinated the Shutdown Project on the
platform offshore OML 102 (OFON2)


Multicultural Management
Followed and check equipment.
Followed prefabrication piping
Followed prefabrication structure
Followed daily and weekly progress
Followed Weekly meeting
Daily and weekly progress report
Followed material arrival
Followed planning with due respect.
Audit and follow up contractors, for shutdown
preparation.
Pre site visit and meeting with contractors.
Followed document Control.
Prepared and follow the green book
Manage and Coordinated offshore shutdown
Organization of safety meetings.
Client: TOTAL Followed
and check equipment.
Followed prefabrication and QA/QC.
Followed planning with due respect.
Followed ICAPS document multidisciplinary.
Followed staff and qualifications (sas Huet, welding licenses, etc.).
Meetings Organization for shutdown preparation progress.
Shutdown administration organization.
Work Permit Preparation and follow up.
Daily report.
Progress daily meeting.
Preparation and Organization of QAQC inspections after welding.
Preparation and Organization of HSSE during shutdown.


Prepares the close-out report after shutdown.

2014 NIGERIA Function: Shutdown Project Coordinator Oil & Gas



Context: Prepares and Manage the Shutdown Offshore & Onshore of the platform OML 99 & OML58 Management multicultural (7 departments TOTAL + 3 subcontractors)

Management of total staff and subcontractors.
Followed and auditing of subcontractors, for the preparation of shutdown.
Pre site visit and meeting with subcontractors.
Document Control.
Organization shutdown.
Organization of safety meetings.
Followed and control equipment.
Followed prefabrication and QA/QC.
Followed planning with due respect.
Logistics of the barge (hospital, doctor, food, accommodation, administrator, etc..).
Organization and logistics platform in kitchens during the shutdown (time, food, etc..).
Followed by a list of staff and their qualifications (sas Huet, License welding, etc..).
Organization of meetings for the advance preparation of shutdown.
Organization of the administration for the shutdown.
Preparation of work permit.
Meeting on site for the organization of work permits.
Preparation and Organization of inspections after welding QA/QC.
Preparation and Organization of hygiene and safety during shutdown HSSE.
Reporting

2013 NIGERIA
Function: Shutdown Coordinator Oil & Gas
Context: Prepares and Manage the Shutdown Offshore & Onshore of the platform OML 99 & OML58 Management multicultural (7 departments TOTAL + 3 subcontractors)

Management of total staff and subcontractors.
Followed and auditing of subcontractors, for the preparation of shutdown.
Pre site visit and meeting with subcontractors.
Document Control.
Organization shutdown.
Organization of safety meetings.
Followed and control equipment.
Followed prefabrication and QA/QC.
Followed planning with due respect.
Logistics of the barge (hospital, doctor, food, accommodation, administrator, etc..).
Organization and logistics platform in kitchens during the shutdown (time, food, etc..).
Followed by a list of staff and their qualifications (sas Huet, License welding, etc..).
Organization of meetings for the advance preparation of shutdown.
Organization of the administration for the shutdown.
Preparation of work permit.
Meeting on site for the organization of work permits.
Preparation and Organization of inspections after welding QA/QC.
Preparation and Organization of hygiene and safety during shutdown HSSE.
Reporting

2012-2013 NIGER: Function: Deputy Site Director
Context: Mining

Management multicultural (6 contractors)
Management and Coordination of construction
Followed planning with due respect.
Construction meeting
Weekly report with the project director
Monthly report
Followed HSE
Followed QA/QC
Followed construction, civil work, piping, electrical, mechanical, equipment’s, material
Followed pre com and commissioning
Followed field engineering
Followed PCM (planning, progress curve, cost, administration, material)
Followed mobilisation plan
Followed the contract with the contract manager


2011 NEW CALEDONIA: Function: Shutdown and General Maintenance Lead (Mining)
Context: Mining

Management multicultural (16 contractors)
Document Control.
Auditing and followed of contractors, for preparation shutdown and curative maintenance.
Create and following the work packs.
Pre site visit and meeting with contractors.
Implementation and following of the JSA (Job Safety Analysis) before work permit
Organize the maintenance preventive and curative.
Preparation and Organization of hygiene and safety role during all intervention (HSSE)
Preparation and following of work permit.
Preparation and Organization of QA/QC inspections.
Followed planning with due respect.


2010 NIGERIA Function: Shutdown Manager Oil & Gas
Context: Prepares and Manage the Shutdown Offshore of the platform OML 99 Management multicultural (7 departments TOTAL + 3 subcontractors)

Management of total staff and subcontractors.
Followed and auditing of subcontractors, for the preparation of shutdown.
Pre site visit and meeting with subcontractors.
Document Control.
Organization shutdown.
Organization of safety meetings.
Followed and control equipment.
Followed prefabrication and QA/QC.
Followed planning with due respect.
Logistics of the barge (hospital, doctor, food, accommodation, administrator, etc..).
Organization and logistics platform in kitchens during the shutdown (time, food, etc..).
Followed by a list of staff and their qualifications (sas Huet, License welding, etc..).
Organization of meetings for the advance preparation of shutdown.
Organization of the administration for the shutdown.
Preparation of work permit.
Meeting on site for the organization of work permits.
Preparation and Organization of inspections after welding QA/QC.
Preparation and Organization of hygiene and safety during shutdown HSSE.
Reporting

2010 KOREA Function: Construction Manager LNG Ship
Context: Construction of LNG Piping and process

Management multicultural (8 supervisor, 6 subcontractors)
Followed personnel and subcontractor
Quality audits subcontractor
Managed assembly (piping, welding, insulation)
Implementation of HSSE
Followed and compliance with the lifting and handling
Compliance with international standards of construction gas
Management QA/QC
Followed planning
Followed and respect for the delay of manufacturing and delivery
Followed budget
Cost control


2009 FRANCE Function: Superintendant
Context: interconnection gas station.

Management of staff and subcontractors (5 supervisors, 4 subcontractors).
Followed by the construction Multidisciplinary.
Quality Audit.
Inspection and followed by the material (equipment) and by the construction.
Control quality and quantity of equipment.
Management of the location of graves of regulations, recoveries of water,
valves and technical buildings in XYZ.
Supervision and inspection of concrete, HP, drying pipe with final report
and cathodic protection.
Respect for the safety standards of the means of lifting and the implementation of the piping’s.
Followed by planning with the client.
Followed earthwork.
Followed by the civil work according to the standards BAEL 91 and eurocod.
Followed ICAPS document multidisciplinary.
File of acceptance and reception civil work.
File of acceptance and reception of the piping and the envelope before put in the ground.
Respect for the standards gas.
Followed equipment and control equipment.
Followed by pre-assembly and assembly of piping, welding.
Followed safety rules for working in ATEX zone.
Application of the standards of hygiene and safety


2008-2009 SOUDAN Function: Manager BOP Mechanical
Contexts: Power plant DAM Project

Multicultural Management (10 supervisors, 45 M / €)
Control cost
Checking equipment and plans for progress
Planning of the works following progress with customer
Definition of resources required for the project
Management of personal and subcontractor
Control of isometric
Followed QA / QC and reception with the client
Followed by non-destructive testing and penetrate test
Followed pre manufacture (mechanical, piping, HVAC)
Reception and control of the material
Followed by stocks
Followed by assembly
Modifying and updating isometrics
Followed supply equipment
Followed and respect for the lifting and the handling
Respect for the standards of hygiene’s and safety
Respect for the standards builder
2006-2008 TURKEY, CHINA, BELGIUM Function: Site Manager
Context: Installation and start-up of rolling mills
Multicultural Management (5 managers, 10 supervisors, 10 M / € per project)
Followed by the construction Multidisciplinary
Control cost
Definition of resources required for the project
Management of personal and subcontractor
Planning of the works following progress with customer
Followed machining
Followed by prefabrication (mechanics, piping)
Followed by assembly
Reception and control of the material
Followed and respect for the lifting and the handling
Followed by the supplies material
Followed by the final assembly (mechanics, piping, electric, automatism)
Followed by the commissioning and rise progressive in step
Respect hygiene’s and safety
Final reception of rolling mills


2002-2006 KOREA, JAPAN, Function: Manager
MALAISIA, SPAIN Context: installation, précommissioning, commissioning of compressor,
heaters vaporaiser on LNG ship (Offshore, Onshore)

Multicultural Management (7 supervisors)
Planning with the customer following progress
Management the assembly of the piping’s on compressors
Followed by cryogenic regulation of valves, PT, pressostats, PT 100, compressors (piping, mechanical, electric and programming)
Loop test
Respect for the standards gas
Followed safety rules for working in ATEX zone
Final inspection and acceptance with the customer
Running test and surge test
Reporting
Gas trial (Offshore)


2001 BRESIL Function: Site Manager
Context: automated line production of electronic locks

Branch site
Multicultural Management (3 managers, 6 supervisors + subcontractor)
Followed budget (15 million / €)
Consultation and audit of the subcontractors
Management of personal
Respect for safety standards
Control of the material and the manufacturing with regard to the specifications
Reporting
Modification of the Schedule following progress of the works
Followed by the commissioning and rise progressive in step


2000 EUROPE Function: Manager Supervision
Context: Installation and start-up automated line production and special machine

Supervision of the assembly
Followed by the standards of construction
Respect for delay
Start and rise progressive in step


1989-1999 MIDDLE EAST, Function: Site Superintendent
AFRICA, EUROPE, Context: Revamping or extension, installation of chemical, petrochemical,
SOUTH AMERICA oil gas, nuclear, pharmaceutical

Followed by construction site
Multicultural Management (4 supervisors + subcontractor)
Control cost
Necessary resource for the diverse projects
Respect for safety standards
Order materials
Followed and respect for the lifting and the handling
Followed by the supplies of material as and when necessary
Technical Solution
Modification of isometrics according to diverse customer modifications
Revision of planning according to the progresses
Reporting


1986-1989 SUISSE Function: Manager
Context: Works of subcontracting piping and mechanical equipments for the construction
of nuclear power plant and central of gas.

Management of construction sites
Advanced Planning work
Management staff and subcontractors
Management and supply of equipment
Followed and compliance with the lifting and handling
Modification basic design
Reporting





Lettre de candidature

Monsieur GU... D
650-020 TONGYOUNG city
Corée Du Sud

CONSTRUCTION MANAGER , SHUTDOWN MANAGER, SUPERINTENDENT


Sir,

I seek your attention, to offer my cooperation.

With an international experience of over 25 years in various fields, I have an excellent knowledge of sales and service in various companies. I had the opportunity to contribute to the definition of areas of interventions in various sectors and monitor the achievement of goals set by my hierarchy. Analyze the functional and technical needs of clients, designing the service to respond and manage multicultural teams, are the main drivers of my motivation. Now wishing to join a group with high potential, the profile of your company especially appeals to me.

My dynamism is the reflection of my taste for the challenge, looking forward to the idea of sharing my knowledge with you, I want to meet you, in order to further my career and my professional aspirations. In the meantime, please to believe, Sir, in my considered the most perfect.

Regards

Monsieur GU... D...


vignette pdfCliquez ici pour récupérer ce CV au format PDF
(Anonyme)

Commandez ce CV en ligne.

Commandez ce CV en ligne.
(1 cv seul)